Tongwei intends to win the bid for Guohua Investment Procurement Project
2023.Mar 17

Tongwei intends to win the bid for the first batch of photovoltaic module procurement projects of Guohua Investment in 2023 (projects in Hebei, Ningxia, and Shandong)


On March 16, Guohua Investment's 2023 first batch (Hebei, Ningxia, Shandong projects) photovoltaic module procurement public bidding candidate announcement, the first winning candidate Tongwei Solar (Hefei) Co., Ltd., bidding price 1437.0947 million yuan ; JinkoSolar, the second winning candidate, bid 1,498,350,207.62 million yuan.

The bidding announcement shows that the 620,000-kilowatt photovoltaic project photovoltaic modules of the National Energy Ningdong Renewable Hydrogen Carbon Emission Reduction Demonstration Area Demonstration Area is 361.3MW, and the delivery location is near the Ningdong Energy and Chemical Base of Ningxia Hui Autonomous Region. Among them, the 218MWp photovoltaic module field is located in The photovoltaic project site in the Meihuajing mining area on the south side of Yongli New Village in Ningdong Base, the 143.3MWp photovoltaic module field is located in the photovoltaic project site of Qingshuiying Coal Mine in Ningdong Base.

The photovoltaic project of Guohua Hebei Company is 420MW, and the delivery location is the project site; the first phase of the 50MW distributed photovoltaic power generation of Huimin County, Guohua Energy Investment Shandong Company is 50MW, and the delivery location is the project site.

The planned bidding capacity is about 831.3MW, and the detailed project capacity is as follows:

Guoneng Ningdong Renewable Hydrogen Carbon Emission Reduction Demonstration Zone Demonstration Zone 620,000-kilowatt photovoltaic project: battery type 182, specification model "545Wp and above P-type double-sided double-glass/560Wp and above N-type double-sided double-glass", supply Capacity 361.3MW;

Photovoltaic project of Guohua Hebei Company: battery type 182, specification model "545Wp and above P-type double-sided double-glass / 560Wp and above N-type double-sided double-glass", supply capacity 420MW;

Guohua Energy Investment Shandong Company Huimin County 50MW Distributed Photovoltaic Power Generation Phase I Project: battery type 182, specification model "540Wp and above P-type single-sided glass/560Wp and above N-type single-sided single-glass", supply capacity 50MW.

Delivery date: The bidder shall promise that the delivery of equipment meets the requirements of the project schedule, and the specific delivery schedule is as follows:

Guoneng Ningdong Renewable Hydrogen Carbon Emission Reduction Demonstration Zone Demonstration Zone 620,000-kilowatt photovoltaic project: completed delivery of 61.3MW in March and 300MW in April;

Photovoltaic project of Guohua Hebei Company: completed delivery of 100MW in March and 320MW in April;

Guohua Energy Investment Shandong Company Huimin County 50MW Distributed Photovoltaic Power Generation Phase I Project: Completed delivery of 10MW in March and 40MW in April;

Monthly total: 171.3MW in March and 660MW in April.

Source: PV Project Intelligence

click here to leave a message

Leave A Message
If you are interested in sunpal solar products and want to know more details,please leave a message here,we will reply you within 24 hrs.

Home

Products

about

WhatsApp